Skip to content
OtisamLMS
Building Construction

Building Construction · Quick practice · answer shown after each question

Site work and foundations

Question 1 of 10

Question 1 of 10

Hardcore under a ground floor slab

Question 2 of 10

Question 2 of 10

Clearing vegetation and topsoil from a building site is

Question 3 of 10

Question 3 of 10

A strip foundation for a wall 225 mm thick is typically

Question 4 of 10

Question 4 of 10

Profile boards are used to

Question 5 of 10

Question 5 of 10

The volume of excavation for a trench 20 m long, 0.6 m wide and 0.9 m deep is

Question 6 of 10

Question 6 of 10

The most common type of foundation for a small house on firm soil is the

Question 7 of 10

Question 7 of 10

The instrument used to transfer levels across a site is the

Question 8 of 10

Question 8 of 10

The foundation most commonly used for small houses on firm soil is the

Question 9 of 10

Question 9 of 10

The process of marking out the positions of walls on site before excavation is

Question 10 of 10

Question 10 of 10

The 3-4-5 method in setting out is used to obtain

Questions written by OtisamLMS in the style of the WASSCE. They are not WAEC past questions.