Building Construction · Quick practice · answer shown after each question

Site work and foundations

Question 1 of 10

Question 1 of 10

A builder's square used for setting out right angles is often based on the ratio

Question 2 of 10

Question 2 of 10

The volume of excavation for a trench 20 m long, 0.6 m wide and 0.9 m deep is

Question 3 of 10

Question 3 of 10

The part of a building that transfers its load to the ground is the

Question 4 of 10

Question 4 of 10

The most common type of foundation for a small house on firm soil is the

Question 5 of 10

Question 5 of 10

Profile boards are used to

Question 6 of 10

Question 6 of 10

Hardcore under a ground floor slab

Question 7 of 10

Question 7 of 10

Clearing vegetation and topsoil from a building site is

Question 8 of 10

Question 8 of 10

Pile foundations transfer loads to

Question 9 of 10

Question 9 of 10

Marking the position of a building on the ground is called

Question 10 of 10

Question 10 of 10

A site investigation is carried out to